NEW IN
QUALITY CONTROL

30 permanent quality control staff

Control procedure  :

1) All incoming materials are checked and tested before production

2) Cut panels are checked before going in to production

3) Random continuous checks are done through out production

4) Final product is then checked before packing

 

 
test